 Is it able to test the Sync. Dynamic load of 3 channels (5V/3.3V/12V) for PC power supply?
The built-in high speed DSP of 63600 and synchronization mechanism allow each module to reach the sync. dynamic loading through the DSP high speed calculation without distorting the loading and test result. Why does SMPS need to do Sync. Dynamic Test? Because it can verify if the PWM, transformer and the system can work normally to ensure the power output quality is stable enough for PC to operate when multiple channels (5V/3.3V/12V) output load steps and the transient load stepsat the same direction.
Is it able to parallel load modules up to 2000W to meet the power supply of large server power for dynamic test?
The built-in Master/Slave Parallel mode is able to connect several modules in parallel to get large power for the dynamic test required by the single channel server. It solves the problem of unable to synchronize the traditional Electronic Load dynamically. This mechanism allows modular load to be structured flexibly for testing single channel large power (server power supply.) Users only need to control the Master unit and measure the readings manually or remotely to save the time.
Sync. Dynamic Setting Parameter
Master/Slave parallel setting parameter
|